Suction+Pressure Blowing

March 22, 2022

Mission Impossible: Cleaning 60m of stream tunnel under the highway in record time!

At Weiss+Appetito Spezialdienste AG, the name stands for extraordinary challenges and customized solutions. Our suction+blowing team has taken on the "Mission Impossible": cleaning a 60-metre-long stream tunnel under the freeway. We tackle even the most complex tasks with passion and expertise to ensure our customers' satisfaction. No matter how challenging or unconventional a project may be, we do everything we can to live up to our reputation as specialists and always exceed expectations.

Andreas Lysser, Project Manager at Weiss+Appetito Special Services AG, was surprised to receive a phone call from the Canton of Bern Civil Engineering Department one Friday. They explained that the culvert carrying a stream under the motorway at Niederwangen had to be cleared of muddy earth in just one week. The water of the Riedbach stream had already been diverted one week previously so that other work could be carried out in the immediate vicinity of the adjacent Stadtbach stream. The Civil Engineering Department saw this as an opportunity to clean the culvert under the motorway while no water was flowing through it. A major challenge that had to be overcome in a short time! But situations such as these are nothing out of the ordinary for our Suction+Pressure Blowing lads. They inspected the culvert on the very same day and work could already start on the following Monday.

 

Team discussion
Preparations

 

Working in a very confined space
A 60 m culvert carrying a stream under the motorway at Niederwangen. About 1 m wide and 80 cm high. Our team crawled through it and extracted the muddy earth, one metre at a time. The assignment took five days, during which about 40 m3 of earth was extracted. The specialists took turns at working in the narrow culvert, which only had enough room for one person at a time. Heavy, backbreaking work and not a job for anyone with claustrophobia, or anyone sensitive to cold temperatures. The mercury actually plunged below zero during these five days, and we prefer not to imagine how it must have felt to work in such cold, wet and muddy conditions in the narrow tunnel. Our team works with motivation and skill to accomplish jobs that push others to their limits!

The highest praise goes to the whole team for their superb execution of the work, their motivation and commitment, and for planning the project in such a short time.

 

Preparatory work
The 60 m culvert with dimensions of 1 m x 0.8 m
Not a job for claustrophobia sufferers

 

 

 

Project data

Client
Civil Engineering Office Canton of Berne, Elmar Scheiwiller

Project Manager
Weiss+Appetito Special Services AG, Andreas Lysser
Team
Vesco Bozovic, Manuel Mendes, Jose Torres

WeissAppetito_Logo