Pharmaboden Bayer stands for the professional installation of a specialized coating system in a modern pharmaceutical production environment. A central part of the work was the application of the PU screed TANAFLOOR 270 on a partial area of the site.. The execution was carried out in strict compliance with safety regulations and was exclusively realized during scheduled downtimes to ensure operational procedures at Bavarian Nordic optimal to support.
Requirements and Planning
Work in pharmaceutical facilities requires coordinated upfront planning and precise coordination of specialists.. Since the measures took place on-site but outside of operations, the building's framework conditions were decisive for the outcome. The focus was on complete documentation of the work steps and compliance with hygiene requirements for industrial flooring in the medical field..
The technical system setup with Tanafloor 270
The chosen system for the Bavarian Nordic pharmaceutical floor consists of coordinated functional layers. Tanafloor 270 is abrasion-resistant, hygienic, and easy to clean. Each step ensures the long-term mechanical resilience and chemical resistance of the soil..
The process began with demolition work and ground preparation. Mechanical processing guarantees optimal adhesion of subsequent layers. A cementitious leveling layer was applied for evenness. This layer forms the geometric basis for the later covering and establishes the necessary flatness in the existing structure.
Quiflex joints were integrated into the system to accommodate component movements. This solution ensures the technical integrity and watertightness of the surface. An essential feature of the Bavarian Nordic pharmaceutical floor is the cove base. This round finishing at the wall connections is ideal for cleanrooms and laboratories to enable residue-free cleaning..
Application of PU screed
The core of the coating is the locally laid PU seamless flooring Tanafloor 270. This material offers slip-resistant properties and is ideally suited for laboratory areas.. After the floor covering was laid, a sealant was applied.. This layer protects the PU floor covering and defines the final ease of cleaning for the overall system..